Delivering complex storage infrastructure through indigenous engineering expertise, advanced fabrication technology and integrated project execution.
Adano Engineering has demonstrated Nigeria’s capacity to deliver complex energy infrastructure through the construction of two 100,000-barrel condensate buffer tanks for the ANOH Gas Processing Company. Awarded in August 2024, the project was completed ahead of schedule in September 2025 and commissioned two months later. It recorded more than 242,000 work-hours without a lost-time incident, supporting infrastructure designed to process approximately 300 million standard cubic feet of gas per day. For Founder and Chief Executive Officer Adano Benson, the achievement reflects capabilities built over time. The company progressively expanded its capabilities from procurement and maintenance services into tank cleaning and rehabilitation, before developing full new-build tank construction and integrated project-delivery capabilities. “Effective leadership means remainingclose to the work, listening to engineers and craftsmen, investing in people and building dependable systems,” he says.
Adano now delivers engineering design and procurement, storage-tank construction and rehabilitation, piping and pipeline systems, civil and structural works, and electrical and instrumentation installations. Its indigenous ownership allows it to respond quickly to regulatory requirements, logistical challenges and community engagement. “Our indigenous ownership gives us proximity to the realities of project execution in Nigeria,” Benson explains.
That local knowledge is reinforced by advanced fabrication technology and international technical relationships.On
the ANOH project, automatic girth-welding machines accelerated tank-shell welding while maintaining consistent quality. Adano uses external partnerships where required but keeps knowledge transfer central to its model. “Indigenous capability should not mean isolation,” Benson says.
Nigeria’s gas-utilization agenda is creating demand for condensate storage, liquefied petroleum gas terminals, pipelines, metering facilities and infrastructure linking gas supply to power plants, petrochemical facilities and industrial clusters.Building on these capabilities, Adano is expanding its delivery of integrated engineering, procurement, fabrication, construction, installation and commissioning projects across Nigeria’s energy sector.
Its next phase will combine larger domestic assignments with the rehabilitation of ageing assets and selective expansion into other African energy markets. “We want to provide integrated facilities from engineering and procurement through fabrication, construction, installation and commissioning,” Benson says.
🌐 www.adanoengineering.com
📞 +234 7055320000
✉️ support@adanoilandgas.com
LinkedIn: Adano Engineering Co. Nig. Ltd